logo资料库

2006年贵州贵阳课改区中考数学真题及答案.doc

第1页 / 共12页
第2页 / 共12页
第3页 / 共12页
第4页 / 共12页
第5页 / 共12页
第6页 / 共12页
第7页 / 共12页
第8页 / 共12页
资料共12页,剩余部分请下载后查看
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "fivewater treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war,ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy",improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of 2006 年贵州贵阳课改区中考数学真题及答案 考生注意: 1.本卷 8 页,三大题 25 小题,满分 150 分,考试时间 120 分钟,考试形式为闭卷。 2.考试时可以使用计算器。 一.选择题:(以下每小题均为 A、B、C、D 四个选项,其中只有一个选项正确,请把正确选 项的字母选入该题的括号内,每小题 4 分,共 20 分) 1. 2 的绝对值等于 (A) (B) 2 (C) 2 (D) 1 2 ( ) ( ) ( ) ( ) 1 2 d f 2.用计算器计算 (A) 0.90 44 (B) cos 的结果(精确到 0.01)是 0.72 (C) 0.69 (D) 0.66 3.以下适合普查的是 (A)了解一批灯泡的使用寿命 (B)调查全国八年级学生的视力情况 (C)评价一个班级升学考试的成绩 (D)了解贵州省的家庭人均收入 4.图 1 是正方体的一个平面展开图,如果折叠成原 来的正方体时与边 a 重合的是 (A) (B) 图 1 (C) (D) e i 5.小明根据邻居家的故事写了一首小诗:“儿子学成今日返,老父早早到车站,儿子到后细 端详,父子高兴把家还。”如果用纵轴 y 表示父亲与儿子行进中离家的距离,用横轴 x 表示父 亲离家的时间,那么下面的图象与上述诗的含义大致吻合的是 ( ) y O y y y x O x O x O x (A) (B) (C) (D) 二.填空题:(每小题 3 分共 30 分) 6.2006 年 5 月 24 日 14 时,三峡大坝的最后一方混凝土浇注完毕,至此三峡工程已完成投 资万元,这个投资数用科学记数法可以表示为 万元; 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated anumber of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity" environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly,promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation timeis over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and "no unauthorised" created
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "fivewater treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war,ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy",improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of 7.分解因式: 3 x 4  x  __________ ______ ; A 图 2 图 3 A D 8.如图 2,P 为⊿ABC 中 BC 边的延长线上一点, _____ ; 70 ,则∠ACP =  ∠A = 50 ,∠B = B 图 4 C P B 9.掷一枚质地均匀的小正方体,它的六个面上分别 标有 1、2、3、4、5、6,则朝上一面的数字是奇数 B A C 的概率是 ; 10.已知点 A( m ,2)在双曲线 y 2 x 上,则 m _____ ; O y C 图 5 O 2 x 11.如图 3,⊙O 是等边三角形 ABC 的外接圆,点 D 是⊙O 上一点,则∠BDC = ; 12.在一节综合实践课上,六名同学做手工的数量(单位:件)分别是:5,7,3,6,6,4; 则这组数据的中位数为 件; 13.如她 4,B 是线段 AC 上的一点,且 圆的面积与大圆的面积之比为 5:2 AB AC : ; ,分别以 AB、AC为直径画圆,则小 14.函数 y 1  x 1 与 y 2 ax  b 的图象如图 5 所示,这两个函数的交点在 y 轴上,那么 1y 、 2y 的值都大于零的 x 的取值范围是 ; 图 6 E 15.如图 6,这是一个供滑板爱好者使用的 U 型池,该 U 型池 B C A 可以看作是一个长方体去掉一个“半圆柱”而成,中间可 D 供滑行部分的截面是半径为 m4 的半圆,其边缘 AB = CD = m20 , 点 E 在 CD 上,CE = m2 ,一滑板爱好者从 A 点滑到 E 点,则 他滑行的最短距离约为 m ;(边缘部分的厚度忽略不极,结果保留整数) 三.解答题: 16.(本题满分 6 分)已知二元一次方程:(1) x 4 y ;(2) 2 x  y 2 ;(3) x  y 2  1 ; 请从这三个方程中选择你喜欢的两个方程,组成一个方程组,并求出这方程组的解; 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated anumber of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity" environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly,promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation timeis over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and "no unauthorised" created
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "fivewater treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war,ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy",improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of 17.(本题满分 10 分)贵阳市某中学开展以“八荣八耻”为主题的社会主义荣辱观教育活动, 举办了演讲、书法、作文、手抄报、小品、漫画六项比赛(每个同学限报一项),学生参赛情 况如下表: 比赛项目 演讲 书法 参赛人数(人) 比例(%) 36 12 25 认真阅读统计表后,回答下列问题: (1)请补充完成这统计表;(3 分) 作文 90 手抄报 小品 漫画 60 20 15 5 8 (2)本次参加比赛的总人数是 人,本次比赛项目的“众数”是 ;(4 分) (3)手抄报作品与漫画作品的获奖人数分别是 6 人和 3 人,你认为“手抄报作品比漫画作品 的获奖率高”这种说法否正确,请说明你的理由;(3 分) 18.(本题满分 10 分)如图 7 ,在某建筑物 AC 上,挂着“多彩贵州”的宣传条幅 BC,小明 站在点 F 处,看条幅顶端 B,测的仰角为 30 ,再往条幅方向前行 20 米到达点 E 处,,看到条 幅顶端 B,测的仰角为 60 ,求宣传条幅 BC 的长,(小明的身高不计,结果精确到 0.1 米) A 图 7 F E B C 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity,low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity" environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir,focus flood control drainage engineering construction, vigorously implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation timeis over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and "no unauthorised" created
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "fivewater treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war,ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy",improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of 19.(本题满分 10 分)桌面上放有 4 张卡片,正面分别标有数字 1,2,3,4,这些卡片除数 字外完全相同,把这些卡片反面朝上洗匀后放在桌面上,甲从中任意抽出一张,记下卡片上 的数字后仍放反面朝上放回洗匀,乙从中任意抽出一张,记下卡片上的数字,然后将这两数 相加; (1)请用列表或画树状图的方法求两数和为 5 的概率;(6 分) (2)若甲与乙按上述方式作游戏,当两数之和为 5 时,甲胜;反之则乙胜;若甲胜一次得 12 分,那么乙胜一次得多少分,这个游戏对双方公平吗? 20.(本题满分 10 分)甲乙两人加工同一种玩具,甲加工 90 个玩具所用的时间与乙加工 120 个玩具所用的时间相等,已知甲乙两人每天共加工 35 个玩具,求甲乙两人每天各加工多少个 玩具? 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated anumber of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity" environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly,promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation timeis over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and "no unauthorised" created
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "fivewater treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war,ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy",improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of 21.(本题满分 10 分)如图 8,这是一个由圆柱体材料加工而成的零件,它是以圆柱体的上 cm12 , 底面为底面,在其内部“掏取”一个与圆柱体等高的圆锥体而得到的,其底面直径 AB = 高 BC = cm8 ,求这个零件的表面积;(结果保留) 图 8 8 cm 12 cm 22.(本题满分 10 分)如图 9,在平行四边形 ABCD 中,对角线 AC\BD 相交于点 O,AF⊥BD, CE⊥BD,垂足分别为 E、F; (1)连结 AE、CF,得四边形 AFCE,试判断四边形 AFCE 是下列图形中的哪一种? ①平行四边形;②菱形;③矩形; (2)请证明你的结论; 图 9 A D E O F B C 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity,low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity" environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir,focus flood control drainage engineering construction, vigorously implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation timeis over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and "no unauthorised" created
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "fivewater treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war,ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy",improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of 23.(本题满分 12 分)某汽车租赁公司要购买轿车和面包车共 10 辆,其中轿车至少要购买 3 辆,轿车每辆 7 万元,面包车每辆 4 万元,公司可投入的购车款不超过 55 万元; (1)符合公司要求的购买方案有几种?请说明理由;(8 分) (2)如果每辆轿车的日租金为 200 元,每辆面包车的日租金为 110 元,假设新购买的这 10 辆车每日都可租出,要使这 10 辆车的日租金不低于 1500 元,那么应选择以上那种购买方案? (4 分) 24.(本题满分 10 分)两条平行直线上各有 n 个点,用这 n 对点按如下的规则连接线段; ①平行线之间的点在连线段时,可以有共同的端点,但不能有其它交点; ②符合①要求的线段必须全部画出; 图 10-1 展示了当 1n 时的情况,此时图中三角形的个数为 0; 图 10-2 展示了当 2n (1)当 3n 时,请在图 10-3 中画出使三角形个数最少的图形,此时图中三角形的个数为 时的一种情况,此时图中三角形的个数为 2; 个;(5 分) (2)试猜想当 n 对点时,按上述规则画出的图形中,最少有多少个三角形?(3 分) (3)当 2006 时,按上述规则画出的图形中,最少有多少个三角形?(2 分) n 图 10- 1 图 10- 2 图 10- 3 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated anumber of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity" environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly,promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation timeis over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and "no unauthorised" created
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "fivewater treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war,ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy",improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of 25.(本题满分 12 分)某商场购进一种单价为 40 元的篮球,如果以单价 50 元出售,那么每 月可售出 500 个,根据销售经验,售价每提高 1 元,销售量相应减少 10 个; (1)假设销售单价提高 x 元,那么销售每个篮球所获得的利润是 月的销售量是 个;(用含 x 的代数式表示)(4 分) 元;这种篮球每 (2)8000 元是否为每月销售这种篮球的最大利润?如果是,请说明理由;如果不是,请求 出最大利润,此时篮球的售价应定为多少元?(8 分) 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity,low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity" environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir,focus flood control drainage engineering construction, vigorously implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation timeis over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and "no unauthorised" created
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "fivewater treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war,ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy",improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of 贵阳市 2006 年初中学业考试试卷(课改区)参考答案与评分标准 一.选择题:(每小题 4 分,共 20 分) 1.B; 2.B; 3.C; 4.A; 5.C; 二.填空题(每小题 3 分,共 30 分) 6. 26.1 710  ; 7. ( xx  )(2 x  )2 ; 8.120; 9. 12.5.5; 13.4:25; 14. 1  x 2 ; 15.22; 三.解答题: 1 2 ; 10. 1 ; 11.60; 16.选择(1)和(2)组成方程组(其它组合情况可参照本解法评分) x 2 x      4 2 y y )1( )2( ————————1 分 (1)+(2)得: 3 x 6 2x 把 2x 代入(1)得: —————————3 分 2y ———————5 分 ∴原方程组的解是 x y      2 2 —————————6 分 注:(1)和(3)组成的方程组的解是 x y      3 1 ,(2)和(3)组成的方程组的解是 x y      1 0 17.(1)75,30,24 ————————3 分 (2)300, 作文 —————————7 分 (3)不正确———————————8 分 因为手抄报作品的获奖率为 10%,漫画作品的获奖率为 20%;——————10 分 18.解法 1:∵∠BFC = 30 ,∠BEC = 60 ,∠BCF = 90 ∴∠EBF =∠EBC = 30 --------------------------3 分 图 7 ∴BE = EF = 20---------------------------------------5 分 在 Rt⊿BCE 中, BC  BE  sin 60  20  3 2  (3.17 m ) ----9 分 F E 答:宣传条幅 BC 的长是 17.3 米。------------10 分 A B C 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated anumber of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity" environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly,promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation timeis over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and "no unauthorised" created
分享到:
收藏